Skip to product information
1 of 7

Ergonomic S Curve Reading Pillow for Sitting in Bed Adult- Back Pillow for Bed Sitting up with Adjustable Headrest- Memory Foam, Pink

Ergonomic S Curve Reading Pillow for Sitting in Bed Adult- Back Pillow for Bed Sitting up with Adjustable Headrest- Memory Foam, Pink

Regular price $53.53 USD
Regular price Sale price $53.53 USD
Sale Sold out
Shipping calculated at checkout.

About This

  • Reading Pillow for Sitting up: We all know how painful it is when we sit up in bed, our whole body lacks of proper support and is forced into a very unnatural position. Our reading pillow fits the body curve so well that you can enjoy your time at bed more.
  • Ergonomic S Curve Back Pillow: Our S curve design is a good match to the body curve, the thick part is to support our lumbar, the thin lower part is to leave space for our hip. Whatever support you need, our pillow can meet.
  • Adjustable Headrest Back Pillow for bed: Our headrest is adjustable through a Velcro design. The pillowcase was made by the hairy side of Velcro and velvet, and the part of the headrest’s pillowcase is Velcro hooks.
  • Premium Memory Foam: Unlike others, our pillow core is made of 100% memory foam core, make it more snug against our back, providing enough support for us.
  • Multi-scenarios: Our reading pillow can be employed to different situations, for instance, couches, study chairs, on the rug against the sofa and so on.

Overview

  • Brand : anzhixiu
  • Special Feature : Removable Cover
  • Color : Pink
  • Fill Material : Memory Foam
  • Age Range (Description) : Adult

Product features

Materials and care

Merchandising tips

View full details
Your cart
Product Product subtotal Quantity Price Product subtotal
Ergonomic S Curve Reading Pillow for Sitting in Bed Adult- Back Pillow for Bed Sitting up with Adjustable Headrest- Memory Foam, Pink
Ergonomic S Curve Reading Pillow for Sitting in Bed Adult- Back Pillow for Bed Sitting up with Adjustable Headrest- Memory Foam, PinkB0FNR6845X
Ergonomic S Curve Reading Pillow for Sitting in Bed Adult- Back Pillow for Bed Sitting up with Adjustable Headrest- Memory Foam, PinkB0FNR6845X
$53.53/ea
$0.00
$53.53/ea $0.00